>INFO MAXINFO=4500 This is the most recent, so far, version of dun86 data. Site 3 spectra have been corrected in corrhz.edi for a likely flip in the Hz data (loop incorrectly installed). new86.edi and dun86.edi should be identical. new86.edi was a re-read of dun86.edi to see if the transfer function swapping problem was solved. Note that site dun86(or corrhz)-s016 is incorrectly placed in the edifile; it's correct lat and long (which may be used to deduce the proper database offsets) are: 49:16:58 N, 115:48:45 W ------------------------------------------------------ Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:LINE12-004A/005a/ Operator:G. Graham Date: JUL 05 1986 Time: 15:40:00 Program Version:MTS-B5 Latest Revision:JUN 30 1986 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:E's 0 dB; H's 0 dB Notch Filters: 60,180,300 Hz Program Control: OPERATOR System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL19 JUN 26 1986 2 Hy1 COIL22 JUN 26 1986 3 Hz1 COIL18 JUN 26 1986 6 Hx2 COIL21 JUN 26 1986 7 Hy2 COIL20 JUN 26 1986 8 Hz2 LOOP15 JUN 26 1986 OPERATOR LOG FOR LINE12-004A/005a/ Recorded XPR Files: X#1 - LINE12-004A/005a/ - ??? JUL 05 1986 X#2 - LINE12-004A/005a/ - ??? JUL 05 1986 X#3 - LINE12-004A/005a/ - ??? JUL 05 1986 X#4 - LINE12-004A/005a/ - ??? JUL 05 1986 X#5 - LINE12-004A/005a/ - ??? JUL 05 1986 X#6 - LINE12-004A/005a/ - ??? JUL 05 1986 X#7 - LINE12-004A/005a/ - ??? JUL 05 1986 X#8 - LINE12-004A/005a/ - ??? JUL 05 1986 X#9 - LINE12-004A/005a/ - ??? JUL 05 1986 X#10 - LINE12-004A/005a/ - ??? JUL 05 1986 X#11 - LINE12-004A/005a/ - ??? JUL 05 1986 X#12 - LINE12-004A/005a/ - ??? JUL 05 1986 X#13 - LINE12-004A/005a/ - ??? JUL 05 1986 X#14 - LINE12-004A/005a/ - ??? JUL 05 1986 X#15 - LINE12-004A/005a/ - ??? JUL 05 1986 X#16 - LINE12-004A/005a/ - ??? JUL 05 1986 X#17 - LINE12-004A/005a/ - ??? JUL 05 1986 X#18 - LINE12-004A/005a/ - ??? JUL 05 1986 Operator:G. Graham Cultural Factors: Coils at 4A were buried shallowly due to wet con Weather Conditions: Cool and cloudy overnight. Other Factors: The sites were separated by 3.5 km of comm. line Station 1 Site Desc:SUNDOWN CREEK S.E. N.T.S. 82G/4 M.G.R. 864476 Elevation:1585 Meters Plot File:1=004A Reference:LINE12-005a Rotation: Principal Axes Site Permitted by:PAC Site Layout by: K. Corman MT Comp Chan# Sensor Azimuth Hx 1 COIL19 +25 DEG Hy 2 COIL22 +115 DEG Hz 3 COIL18 Ex 4 56 M +25 DEG Ey 5 62 M +115 DEG Rx 6 COIL21 +25 DEG Ry 7 COIL20 +115 DEG Ex Pot Resistance: 9.5 K Ohms Ex Voltage: AC= 1.0 mv, DC=23.8 mv Ey Pot Resistance: 7.0 K Ohms Ey Voltage: AC= 3.3 mv, DC=18.6 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:LINE12-004A/005a/ Operator:G. Graham Date: JUL 05 1986 Time: 15:40:00 Program Version:MTS-B5 Latest Revision:JUN 30 1986 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:E's 0 dB; H's 0 dB Notch Filters: 60,180,300 Hz Program Control: OPERATOR System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL19 JUN 26 1986 2 Hy1 COIL22 JUN 26 1986 3 Hz1 COIL18 JUN 26 1986 6 Hx2 COIL21 JUN 26 1986 7 Hy2 COIL20 JUN 26 1986 8 Hz2 LOOP15 JUN 26 1986 OPERATOR LOG FOR LINE12-004A/005a/ Recorded XPR Files: X#1 - LINE12-004A/005a/ - ??? JUL 05 1986 X#2 - LINE12-004A/005a/ - ??? JUL 05 1986 X#3 - LINE12-004A/005a/ - ??? JUL 05 1986 X#4 - LINE12-004A/005a/ - ??? JUL 05 1986 X#5 - LINE12-004A/005a/ - ??? JUL 05 1986 X#6 - LINE12-004A/005a/ - ??? JUL 05 1986 X#7 - LINE12-004A/005a/ - ??? JUL 05 1986 X#8 - LINE12-004A/005a/ - ??? JUL 05 1986 X#9 - LINE12-004A/005a/ - ??? JUL 05 1986 X#10 - LINE12-004A/005a/ - ??? JUL 05 1986 X#11 - LINE12-004A/005a/ - ??? JUL 05 1986 X#12 - LINE12-004A/005a/ - ??? JUL 05 1986 X#13 - LINE12-004A/005a/ - ??? JUL 05 1986 X#14 - LINE12-004A/005a/ - ??? JUL 05 1986 X#15 - LINE12-004A/005a/ - ??? JUL 05 1986 X#16 - LINE12-004A/005a/ - ??? JUL 05 1986 X#17 - LINE12-004A/005a/ - ??? JUL 05 1986 X#18 - LINE12-004A/005a/ - ??? JUL 05 1986 Operator:G. Graham Cultural Factors: Coils at 4A were buried shallowly due to wet con Weather Conditions: Cool and cloudy overnight. Other Factors: The sites were separated by 3.5 km of comm. line Station 2 Site Desc:SUNDOWN CREEK EAST FORK N.T.S. 82G/4 M.G.R. 876484 Elevation:1631 Meters Plot File:2=005a Reference:LINE12-004A Rotation: Principal Axes Site Permitted by:PAC Site Layout by: P. Cartwright MT Comp Chan# Sensor Azimuth Hx 6 COIL21 +25 DEG Hy 7 COIL20 +115 DEG Hz 8 LOOP15 Original Ex 9 48 M +25 DEG Ey 10 62 M +115 DEG Rx 1 COIL19 +25 DEG Ry 2 COIL22 +115 DEG Ex Pot Resistance: 9.0 K Ohms Ex Voltage: AC= 2.5 mv, DC=59.3 mv Ey Pot Resistance: 9.0 K Ohms Ey Voltage: AC= 3.3 mv, DC=28.8 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:LINE12-006a/ Operator:M.CORMIER Date: JUL 04 1986 Time: 19:06:00 Program Version:MTS-B5 Latest Revision:JUN 30 1986 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:E's 0 dB; H's 0 dB Notch Filters: 60,180,300 Hz Program Control: OPERATOR System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL18 JUN 26 1986 2 Hy1 COIL19 JUN 26 1986 3 Hz1 LOOP15 JUN 26 1986 6 Hx2 COIL22 JUN 26 1986 7 Hy2 COIL20 JUN 26 1986 OPERATOR LOG FOR LINE12-006a/ Recorded XPR Files: X#1 - LINE12-006a/ - ??? JUL 04 1986 X#2 - LINE12-006a/ - ??? JUL 04 1986 X#3 - LINE12-006a/ - ??? JUL 04 1986 X#4 - LINE12-006a/ - ??? JUL 04 1986 X#5 - LINE12-006a/ - ??? JUL 04 1986 X#6 - LINE12-006a/ - ??? JUL 04 1986 X#7 - LINE12-006a/ - ??? JUL 04 1986 X#8 - LINE12-006a/ - ??? JUL 04 1986 X#9 - LINE12-006a/ - ??? JUL 04 1986 X#10 - LINE12-006a/ - ??? JUL 04 1986 X#11 - LINE12-006a/ - ??? JUL 04 1986 X#12 - LINE12-006a/ - ??? JUL 04 1986 X#13 - LINE12-006a/ - ??? JUL 04 1986 X#14 - LINE12-006a/ - ??? JUL 04 1986 X#15 - LINE12-006a/ - ??? JUL 04 1986 X#16 - LINE12-006a/ - ??? JUL 04 1986 X#17 - LINE12-006a/ - ??? JUL 04 1986 Operator:M. Cormier Cultural Factors: VHF T.V. tower located about 7 km from site. Weather Conditions: Cool, cloudy with moderate breezes overnigh. Other Factors: None apparent. Station 1 Site Desc:SUNRISE CK SOUTH N.T.S. 82G/4_ M.G.R. 898489 Elevation:1738 Plot File:1=006a Reference:LINE12-006R Rotation: Principal Axes Site Permitted by:PAC Site Layout by: KC MT Comp Chan# Sensor Azimuth Hx 1 COIL18 +30 DEG Hy 2 COIL19 +120 DEG Hz 3 LOOP15 Original Ex 4 76 M +30 DEG Ey 5 61 M +120 DEG Rx 6 COIL22 +30 DEG Ry 7 COIL20 +120 DEG Ex Pot Resistance: 10 K Ohms Ex Voltage: AC=15.2 mv, DC=12.4 mv Ey Pot Resistance: 6 K Ohms Ey Voltage: AC=16.3 mv, DC=35.2 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:KB8698-014c/145a/ Operator:M. Cormier Date: JUL 07 1986 Time: 17:50:00 Program Version:MTS-B5 Latest Revision:JUN 30 1986 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:E's -10 dB; H's 0 dB Notch Filters: 60,180,300 Hz Program Control: OPERATOR System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL24 JUN 26 1986 2 Hy1 COIL20 JUN 26 1986 3 Hz1 LOOP12 JUN 26 1986 6 Hx2 COIL19 JUN 26 1986 7 Hy2 COIL21 JUN 26 1986 8 Hz2 LOOP13 JUN 26 1986 OPERATOR LOG FOR KB8698-014c/145a/ Recorded XPR Files: X#1 - KB8698-014c/145a/ - ??? JUL 07 1986 X#2 - KB8698-014c/145a/ - ??? JUL 07 1986 X#3 - KB8698-014c/145a/ - ??? JUL 07 1986 X#4 - KB8698-014c/145a/ - ??? JUL 07 1986 X#5 - KB8698-014c/145a/ - ??? JUL 07 1986 X#6 - KB8698-014c/145a/ - ??? JUL 07 1986 X#7 - KB8698-014c/145a/ - ??? JUL 07 1986 X#8 - KB8698-014c/145a/ - ??? JUL 07 1986 X#9 - KB8698-014c/145a/ - ??? JUL 07 1986 X#10 - KB8698-014c/145a/ - ??? JUL 07 1986 X#11 - KB8698-014c/145a/ - ??? JUL 07 1986 X#12 - KB8698-014c/145a/ - ??? JUL 07 1986 X#13 - KB8698-014c/145a/ - ??? JUL 07 1986 X#14 - KB8698-014c/145a/ - ??? JUL 07 1986 X#15 - KB8698-014c/145a/ - ??? JUL 07 1986 X#16 - KB8698-014c/145a/ - ??? JUL 07 1986 X#17 - KB8698-014c/145a/ - ??? JUL 07 1986 X#18 - KB8698-014c/145a/ - ??? JUL 07 1986 X#19 - KB8698-014c/145a/ - ??? JUL 07 1986 Operator:M. Cormier Cultural Factors: Power line located 100 m from site 014c and 500 Weather Conditions: A calm, mild, clear night. Other Factors: Gains set to -10 (E) and 0 (H) due to AC noise f Station 2 Site Desc:FARRELL CREEK N.T.S. 82G/5 M.G.R. 847566 Elevation:1000 Meters Plot File:2=145a Reference:KB8698-014c Rotation: Principal Axes Site Permitted by:PAC Site Layout by: PAC MT Comp Chan# Sensor Azimuth Hx 6 COIL19 +20 DEG Hy 7 COIL21 +110 DEG Hz 8 LOOP13 Original Ex 9 33 M +20 DEG Ey 10 59 M +110 DEG Rx 1 COIL24 -35 DEG Ry 2 COIL20 +55 DEG Ex Pot Resistance: 4.5 K Ohms Ex Voltage: AC=77.4 mv, DC= 1.2 mv Ey Pot Resistance: 3.0 K Ohms Ey Voltage: AC=10.1 mv, DC=54.5 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:KB8698-810b/ Operator:MM/KC Date: JUL 07 1986 Time: 09:30:00 Program Version:MTS-B5 Latest Revision:JUN 30 1986 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:E's 0 dB; H's 0 dB Notch Filters: 60,180,300 Hz Program Control: OPERATOR System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL23 JUN 26 1986 2 Hy1 COIL18 JUN 26 1986 3 Hz1 LOOP15 JUN 26 1986 6 Hx2 COIL21 JUN 26 1986 7 Hy2 COIL20 JUN 26 1986 OPERATOR LOG FOR KB8698-810b/ Recorded XPR Files: X#1 - KB8698-810b/ - ??? JUL 07 1986 X#2 - KB8698-810b/ - ??? JUL 07 1986 X#3 - KB8698-810b/ - ??? JUL 07 1986 X#4 - KB8698-810b/ - ??? JUL 07 1986 X#5 - KB8698-810b/ - ??? JUL 07 1986 X#6 - KB8698-810b/ - ??? JUL 07 1986 X#7 - KB8698-810b/ - ??? JUL 07 1986 X#8 - KB8698-810b/ - ??? JUL 07 1986 X#9 - KB8698-810b/ - ??? JUL 07 1986 Operator: G. GRAHAM / M.M. Cultural Factors: THREE PHASE POWER LINES 150 METERS WEST OF SITE Weather Conditions: HOT AFTERNOON . Other Factors: REPEATING LOW RANGE ONLY, HIGH RANGE DATA IS GOO Station 1 Site Desc:PEAVINE CREEK N.T.S. 82G/5 M.G.R. ______ Elevation:Not Entered Plot File:1=810b Reference:KB8698-810R Rotation: Principal Axes Site Permitted by:PAC Site Layout by: G. Graham MT Comp Chan# Sensor Azimuth Hx 1 COIL23 -40 DEG Hy 2 COIL18 +50 DEG Hz 3 LOOP15 Original Ex 4 57 M -40 DEG Ey 5 57 M +50 DEG Rx 6 COIL21 -40 DEG Ry 7 COIL20 +50 DEG Ex Pot Resistance: 9.5 K Ohms Ex Voltage: AC=12.3 mv, DC=42.2 mv Ey Pot Resistance: 9.0 K Ohms Ey Voltage: AC=13.2 mv, DC=38.1 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:LINE12-003b/002b/ Operator:G. GRAHAM Date: JUL 04 1986 Time: 11:41:00 Program Version:MTS-B5 Latest Revision:JUN 30 1986 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:E's 0 dB; H's 0 dB Notch Filters: 60,180,300 Hz Program Control: OPERATOR System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL22 JUN 26 1986 2 Hy1 COIL20 JUN 26 1986 3 Hz1 LOOP13 JUN 26 1986 6 Hx2 COIL23 JUN 26 1986 7 Hy2 COIL21 JUN 26 1986 8 Hz2 LOOP12 JUN 26 1986 OPERATOR LOG FOR LINE12-003b/002b/ Recorded XPR Files: X#1 - LINE12-003b/002b/ - ??? JUL 04 1986 X#2 - LINE12-003b/002b/ - ??? JUL 04 1986 X#3 - LINE12-003b/002b/ - ??? JUL 04 1986 Operator:G.GRAHAM Cultural Factors: Weather Conditions: RAIN DURING NIGHT AND MORNING SHOWERS Other Factors: FIRST RUN INTERRUPTED BY CHEWING OF SITE 2 E LIN Station 2 Site Desc:YAHK RIDGE N.T.S. 82G/4 M.G.R. 839480 Elevation:1494 Meters Plot File:2=002b Reference:LINE12-003b Rotation: Principal Axes Site Permitted by:PAC Site Layout by: M. M. MT Comp Chan# Sensor Azimuth Hx 6 COIL23 +0 DEG Hy 7 COIL21 +90 DEG Hz 8 LOOP12 Original Ex 9 70 M +0 DEG Ey 10 50 M +90 DEG Rx 1 COIL22 -35 DEG Ry 2 COIL20 +55 DEG Ex Pot Resistance: 2.0 K Ohms Ex Voltage: AC= 5.0 mv, DC=59.0 mv Ey Pot Resistance: 0.5 K Ohms Ey Voltage: AC= 2.3 mv, DC= 7.2 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:LINE12-003b/002b/ Operator:G. GRAHAM Date: JUL 04 1986 Time: 11:41:00 Program Version:MTS-B5 Latest Revision:JUN 30 1986 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:E's 0 dB; H's 0 dB Notch Filters: 60,180,300 Hz Program Control: OPERATOR System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL22 JUN 26 1986 2 Hy1 COIL20 JUN 26 1986 3 Hz1 LOOP13 JUN 26 1986 6 Hx2 COIL23 JUN 26 1986 7 Hy2 COIL21 JUN 26 1986 8 Hz2 LOOP12 JUN 26 1986 OPERATOR LOG FOR LINE12-003b/002b/ Recorded XPR Files: X#1 - LINE12-003b/002b/ - ??? JUL 04 1986 X#2 - LINE12-003b/002b/ - ??? JUL 04 1986 X#3 - LINE12-003b/002b/ - ??? JUL 04 1986 Operator:G.GRAHAM Cultural Factors: Weather Conditions: RAIN DURING NIGHT AND MORNING SHOWERS Other Factors: FIRST RUN INTERRUPTED BY CHEWING OF SITE 2 E LIN Station 1 Site Desc:SUNDOWN CREEK N.T.S. 82G/4 M.G.R. 897493 Elevation:1311 Meters Plot File:1=003b Reference:LINE12-002b Rotation: Principal Axes Site Permitted by:PAC Site Layout by: M.M. MT Comp Chan# Sensor Azimuth Hx 1 COIL22 -35 DEG Hy 2 COIL20 +55 DEG Hz 3 LOOP13 Original Ex 4 49 M -35 DEG Ey 5 76 M +55 DEG Rx 6 COIL23 +0 DEG Ry 7 COIL21 +90 DEG Ex Pot Resistance: 1.0 K Ohms Ex Voltage: AC= 3.6 mv, DC= 7.9 mv Ey Pot Resistance: 1.0 K Ohms Ey Voltage: AC=14.0 mv, DC=16.4 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:LINE11-014b/013b/ Operator:MIKE CORMIER Date: JUN 28 1986 Time: 17:51:00 Program Version:MTS-B4 Latest Revision:MAR 25 1985 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:OPERATOR Notch Filters: 60,180,300 Hz Program Control: System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL18 JUN 26 1986 2 Hy1 COIL21 JUN 26 1986 3 Hz1 LOOP15 JUN 26 1986 6 Hx2 COIL20 JUN 26 1986 7 Hy2 COIL19 JUN 26 1986 8 Hz2 COIL23 JUN 26 1986 OPERATOR LOG FOR LINE11-014b/013b/ Recorded XPR Files: X#1 - LINE11-014b/013b/ - ??? JUN 28 1986 X#2 - LINE11-014b/013b/ - ??? JUN 28 1986 X#3 - LINE11-014b/013b/ - ??? JUN 28 1986 X#4 - LINE11-014b/013b/ - ??? JUN 28 1986 X#5 - LINE11-014b/013b/ - ??? JUN 29 1986 X#6 - LINE11-014b/013b/ - ??? JUN 29 1986 X#7 - LINE11-014b/013b/ - ??? JUN 29 1986 X#8 - LINE11-014b/013b/ - ??? JUN 29 1986 X#9 - LINE11-014b/013b/ - ??? JUN 29 1986 X#10 - LINE11-014b/013b/ - ??? JUN 29 1986 X#11 - LINE11-014b/013b/ - ??? JUN 29 1986 X#12 - LINE11-014b/013b/ - ??? JUN 29 1986 X#13 - LINE11-014b/013b/ - ??? JUN 29 1986 X#14 - LINE11-014b/013b/ - ??? JUN 29 1986 X#15 - LINE11-014b/013b/ - ??? JUN 29 1986 X#16 - LINE11-014b/013b/ - ??? JUN 29 1986 X#17 - LINE11-014b/013b/ - ??? JUN 29 1986 X#18 - LINE11-014b/013b/ - ??? JUN 29 1986 X#19 - LINE11-014b/013b/ - ??? JUN 29 1986 X#20 - LINE11-014b/013b/ - ??? JUN 29 1986 Operator:M. CORMIER Cultural Factors: LOTS OF CULTURAL FACTORS. Weather Conditions: LIGHTEN STROM DURING THE NIGHT. Other Factors: DISCONNECTED BETWEEN 9 PM AND 1 AM. Station 2 Site Desc:FARRELL CREEK N.T.S. 82G/5 M.G.R. 838564 Elevation:869 Meters Plot File:2=013b Reference:LINE11-014b Rotation: Principal Axes Site Permitted by:PAC Site Layout by: GG MT Comp Chan# Sensor Azimuth Hx 6 COIL20 +0 DEG Hy 7 COIL19 +90 DEG Hz 8 COIL23 Ex 9 40 M +0 DEG Ey 10 35 M +90 DEG Rx 1 COIL18 -35 DEG Ry 2 COIL21 +55 DEG Ex Pot Resistance: 12 K Ohms Ex Voltage: AC= 32 mv, DC= 1 mv Ey Pot Resistance: 11 K Ohms Ey Voltage: AC= 58 mv, DC= 10 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:LINE11-014a/013a/ Operator:G. GRAHAM Date: JUN 27 1986 Time: 20:12:00 Program Version:MTS-B4 Latest Revision:MAR 25 1985 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:OPERATOR Notch Filters: 60,180,300 Hz Program Control: System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL18 JUN 26 1986 2 Hy1 COIL21 JUN 26 1986 3 Hz1 LOOP15 JUN 26 1986 6 Hx2 COIL20 JUN 26 1986 7 Hy2 COIL19 JUN 26 1986 8 Hz2 LOOP12 JUN 26 1986 OPERATOR LOG FOR LINE11-014a/013a/ Recorded XPR Files: X#1 - LINE11-014a/013a/ - ??? JUN 27 1986 X#2 - LINE11-014a/013a/ - ??? JUN 27 1986 X#3 - LINE11-014a/013a/ - ??? JUN 27 1986 X#4 - LINE11-014a/013a/ - ??? JUN 27 1986 X#5 - LINE11-014a/013a/ - ??? JUN 27 1986 X#6 - LINE11-014a/013a/ - ??? JUN 27 1986 X#7 - LINE11-014a/013a/ - ??? JUN 27 1986 X#8 - LINE11-014a/013a/ - ??? JUN 27 1986 X#9 - LINE11-014a/013a/ - ??? JUN 27 1986 X#10 - LINE11-014a/013a/ - ??? JUN 27 1986 X#11 - LINE11-014a/013a/ - ??? JUN 27 1986 X#12 - LINE11-014a/013a/ - ??? JUN 27 1986 X#13 - LINE11-014a/013a/ - ??? JUN 27 1986 X#14 - LINE11-014a/013a/ - ??? JUN 27 1986 X#15 - LINE11-014a/013a/ - ??? JUN 27 1986 X#16 - LINE11-014a/013a/ - ??? JUN 27 1986 X#17 - LINE11-014a/013a/ - ??? JUN 27 1986 Operator:G. GRAHAM Cultural Factors: LOTS OF CULTURAL FACTORS, JUST LOOK AT THE MAP. Weather Conditions: OVERCAST SKY WITH A GENTAL BREEZE. Other Factors: Station 1 Site Desc:MOYIE LAKE SOUTH N.T.S. 82G/5 M.G.R. 843567 Elevation:990.85 Meters Plot File:1=014a Reference:LINE11-013a Rotation: Principal Axes Site Permitted by:P. CARTWRIGHT Site Layout by: G. GRAHAM MT Comp Chan# Sensor Azimuth Hx 1 COIL18 -35 DEG Hy 2 COIL21 +55 DEG Hz 3 LOOP15 Original Ex 4 51 M -35 DEG Ey 5 26 M +55 DEG Rx 6 COIL20 +0 DEG Ry 7 COIL19 +90 DEG Ex Pot Resistance: 9.0 K Ohms Ex Voltage: AC=64.0 mv, DC= 8.0 mv Ey Pot Resistance: 8.0 K Ohms Ey Voltage: AC=45.0 mv, DC=18.0 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:LINE11-016a/015a/ Operator:M. Makulowich Date: JUN 29 1986 Time: 16:39:00 Program Version:MTS-B4 Latest Revision:MAR 25 1985 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:OPERATOR Notch Filters: 60,180,300 Hz Program Control: System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL21 JUN 26 1986 2 Hy1 COIL18 JUN 26 1986 3 Hz1 LOOP14 JUN 26 1986 6 Hx2 COIL22 JUN 26 1986 7 Hy2 COIL24 JUN 26 1986 8 Hz2 LOOP13 JUN 26 1986 OPERATOR LOG FOR LINE11-016a/015a/ Recorded XPR Files: X#1 - LINE11-016a/015a/ - ??? JUN 29 1986 X#2 - LINE11-016a/015a/ - ??? JUN 29 1986 X#3 - LINE11-016a/015a/ - ??? JUN 29 1986 X#4 - LINE11-016a/015a/ - ??? JUN 29 1986 X#5 - LINE11-016a/015a/ - ??? JUN 29 1986 X#6 - LINE11-016a/015a/ - ??? JUN 29 1986 X#7 - LINE11-016a/015a/ - ??? JUN 29 1986 X#8 - LINE11-016a/015a/ - ??? JUN 29 1986 X#9 - LINE11-016a/015a/ - ??? JUN 29 1986 X#10 - LINE11-016a/015a/ - ??? JUN 29 1986 X#11 - LINE11-016a/015a/ - ??? JUN 29 1986 X#12 - LINE11-016a/015a/ - ??? JUN 29 1986 X#13 - LINE11-016a/015a/ - ??? JUN 29 1986 X#14 - LINE11-016a/015a/ - ??? JUN 30 1986 X#15 - LINE11-016a/015a/ - ??? JUN 30 1986 X#16 - LINE11-016a/015a/ - ??? JUN 30 1986 X#17 - LINE11-016a/015a/ - ??? JUN 30 1986 X#18 - LINE11-016a/015a/ - ??? JUN 30 1986 X#19 - LINE11-016a/015a/ - ??? JUN 30 1986 X#20 - LINE11-016a/015a/ - ??? JUN 30 1986 Operator:G. GRAHAM Cultural Factors: BOTH SITE ARE LOCATED IN FORESTED AREAS ON THE S Weather Conditions: COOL EVENING WITH OVERCAST SKY AND GENTLE BREEZE Other Factors: NATURAL SIGNAL LEVELS ARE LOW. Station 2 Site Desc:LAKEVIEW N.T.S. 82G/5 M.G.R. 855574 Elevation:1280 Meters Plot File:2=015a Reference:LINE11-016a Rotation: Principal Axes Site Permitted by:PAC Site Layout by: GG MT Comp Chan# Sensor Azimuth Hx 6 COIL22 +35 DEG Hy 7 COIL24 +125 DEG Hz 8 LOOP13 Original Ex 9 65 M +35 DEG Ey 10 68 M +125 DEG Rx 1 COIL21 +0 DEG Ry 2 COIL18 +90 DEG Ex Pot Resistance: 25 K Ohms Ex Voltage: AC= 42 mv, DC= 6 mv Ey Pot Resistance: 18 K Ohms Ey Voltage: AC= 16 mv, DC= 2.3 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 Run Information Project:MOYIE LAKE SOUTH 86-98 Client:KOOTENAY BAY EXPLORATION LTD Run:LINE11-016a/015a/ Operator:M. Makulowich Date: JUN 29 1986 Time: 16:39:00 Program Version:MTS-B4 Latest Revision:MAR 25 1985 Reference Field: 4 = Rem H Reference XPR Weighting: 2 = Rho Variance XPR Record Int: Operator Selected Sensor Box Gains:OPERATOR Notch Filters: 60,180,300 Hz Program Control: System Calibration KOOTENAY BAY CAL 86-98 By G.G. / K.C Date: JUN 26 1986 File: C#1 Sensor Calibration Chan# Chan Sensor Cal Date 1 Hx1 COIL21 JUN 26 1986 2 Hy1 COIL18 JUN 26 1986 3 Hz1 LOOP14 JUN 26 1986 6 Hx2 COIL22 JUN 26 1986 7 Hy2 COIL24 JUN 26 1986 8 Hz2 LOOP13 JUN 26 1986 OPERATOR LOG FOR LINE11-016a/015a/ Recorded XPR Files: X#1 - LINE11-016a/015a/ - ??? JUN 29 1986 X#2 - LINE11-016a/015a/ - ??? JUN 29 1986 X#3 - LINE11-016a/015a/ - ??? JUN 29 1986 X#4 - LINE11-016a/015a/ - ??? JUN 29 1986 X#5 - LINE11-016a/015a/ - ??? JUN 29 1986 X#6 - LINE11-016a/015a/ - ??? JUN 29 1986 X#7 - LINE11-016a/015a/ - ??? JUN 29 1986 X#8 - LINE11-016a/015a/ - ??? JUN 29 1986 X#9 - LINE11-016a/015a/ - ??? JUN 29 1986 X#10 - LINE11-016a/015a/ - ??? JUN 29 1986 X#11 - LINE11-016a/015a/ - ??? JUN 29 1986 X#12 - LINE11-016a/015a/ - ??? JUN 29 1986 X#13 - LINE11-016a/015a/ - ??? JUN 29 1986 X#14 - LINE11-016a/015a/ - ??? JUN 30 1986 X#15 - LINE11-016a/015a/ - ??? JUN 30 1986 X#16 - LINE11-016a/015a/ - ??? JUN 30 1986 X#17 - LINE11-016a/015a/ - ??? JUN 30 1986 X#18 - LINE11-016a/015a/ - ??? JUN 30 1986 X#19 - LINE11-016a/015a/ - ??? JUN 30 1986 X#20 - LINE11-016a/015a/ - ??? JUN 30 1986 Operator:G. GRAHAM Cultural Factors: BOTH SITE ARE LOCATED IN FORESTED AREAS ON THE S Weather Conditions: COOL EVENING WITH OVERCAST SKY AND GENTLE BREEZE Other Factors: NATURAL SIGNAL LEVELS ARE LOW. Station 1 Site Desc:MOYIE MTN. N.T.S. 82G/5 M.G.R. 864577 Elevation:1501.5 Meters Plot File:1=016a Reference:LINE11-015a Rotation: Principal Axes Site Permitted by:PAC Site Layout by: MM MT Comp Chan# Sensor Azimuth Hx 1 COIL21 +0 DEG Hy 2 COIL18 +90 DEG Hz 3 LOOP14 Original Ex 4 51 M +0 DEG Ey 5 60 M +90 DEG Rx 6 COIL22 +35 DEG Ry 7 COIL24 +125 DEG Ex Pot Resistance: 8 K Ohms Ex Voltage: AC=10.5 mv, DC=15.8 mv Ey Pot Resistance: 8.5 K Ohms Ey Voltage: AC= 8.3 mv, DC= 2.8 mv In this file it is assumed that the magnetic sens are arranged in a fixed location with respect to th REFLAT and REFLONG in the file. SENSOR X(m) Y(m) Hx 17 17 Hy -17 17 Hz 17 -17 RHx 1280 1270 RHy 1270 1280 Ex calculated (centred on REFLAT, REFLO Ey calculated (centred on REFLAT, REFLO REx 1225-1325 1275 REy 1275 1225-1325 ------------------------------------------------------