Lines 1-10 Acquisition parameters Contractor: Veritas Geophysical Ltd. Recorded: 1987 Source: 4 Vibs, 14 s 12-52 Hz sweep, 8 sweeps/VP Receivers: Oyo 14 Hz, 12 per group Instrumentation: 240 channel DFS V Recording: 18 s at 4 ms sample rate, SEGB on 9-track tape Spread: 50 m station spacing, 100 m source spacing, 60-180 split, 60 fold Processing Processor: Weizhong Wang, U of Toronto Processing flow includes crossdip corrections Lines 12,14 Processing Processors: Andy Calvert and Pulsonic Geophysical