Phase II Acquisition parameters Contractor: Enertec Geophysical Services Ltd. Recorded: 1993 Source: 4 Vibs, 14 s 10-56 Hz sweep, 7 sweeps/VP Receivers: 14 Hz, 9 per group Instrumentation: 400 channel MDS-18X Recording: 32 s uncorrelated at 4 ms sample rate, SEGD on IBM 3480 cartridges Spread: 50 m station spacing, 100 m source spacing, 200-200 split, 100 fold Processing Contractor: Seismic Data Processors Ltd. Geometry: crooked line, 25 by 2000 m bins Notch filter: 60 Hz Spiking deconvolution: 80 ms operator length Bandpass filter: 0-3 s: 16-20-55-59 Hz; 3-18 s: 12-15-45-50 Hz AGC: 500 ms Field statics: to 400 m, replacement velocity 6000 m/s NMO correction First break mute Trim statics: 3-10 s window, +/- 20 ms Stack Time-variant bandpass filter Time-variant AGC scaling FK migration: 6000 m/s