Phase I Acquisition parameters Contractor: JRS Exploration Recorded: 1991 Source: 4 Vibs, 14 s 10-56 Hz sweep, 8 sweeps/VP Receivers: 14 Hz, 9 per group Instrumentation: 240 channel Sercel 368 Recording: 18 s at 4 ms sample rate, SEGY on 9-track tape Spread: 50 m station spacing, 100 m source spacing, 80-160 split, 60 fold Processing Contractor: Seismic Data Processors Ltd. Geometry: crooked line, 25 by 2000 m bins Notch filter: 60 Hz Spiking deconvolution: 80 ms operator length Bandpass filter: 0-3 s: 16-20-55-59 Hz; 3-18 s: 12-15-45-50 Hz AGC: 500 ms Field statics: to 400 m, replacement velocity 6000 m/s NMO correction First break mute Trim statics: 3-10 s window, +/- 20 ms Stack Time-variant bandpass filter Time-variant AGC scaling FK migration: 6000 m/s